000 03115naa a2200325Ia 4500
003 OSt
005 20260422144941.0
008 260422s2020 xx 000 0 und d
040 _aFoundation University
_beng
_cFoundation University
_erda
050 _aGS (MBA-FS) LG 221 D35 G73
_bA5 B87 2013 A73
099 _a2460
100 _aAragones, Janice A.
_95261
_eauthor.
245 1 0 _aEstablishment of weighbriged facility at Port of Larena , Larena Siquijor /
_cby Janice A. Aragones
260 _aDumaguete City :
_bFoundation University ;
_c2013.
264 _c2013.
_42013.
300 _axvii, 161 leaves :
_3ill. (col.) photographs ;
_bvolume
_c28 cm
_fresource
336 _2rdacontent
_atext
_btxt
337 _2rdamedia
_aunmediated
_bn
338 _3rdacontent
_avolume
_bnc
502 _aGraduate feasibility study (Master of Business Administration) -- Foundation University, 2013.
504 _aIncludes bibliographical references and appendices.
520 _aABSTRACT The study is all about establishing a Weighbridge in the Municipality of Siquijor. It situated at the Port of Larena, Siquijor, where RORO ramp are located. The main objective is to provide weighbridge faclity that would cater the needs of the shippers who have cargo transactions at the port. This facility is also needed to the travellers who owned vehicles and will be travelling with their vehicles outside Siquijor. The feasibility of the proposed project was assessed in terms of the following aspect: (1) management aspect; (2) technical aspect of the project; (3) marketing aspect; (4) financial aspect of the project and (5) the socio-economic desirability of the project. The study made by the researcher yields a very favourable result. In the management point of view, the company will manage the operation daily in line with the organizations goals and objectives. The proponent would hire the best people that qualified to every job description and qualification. Technically, the project is made feasible considering the services with a modern facilities offered by the company. In the marketing point of view, the project is really feasíble since the respondents are willing to patronize the facility and are capable in utilizing it. Financial results show that the proposed project is financially feasible and pursuing it will yield a very good retur investment to the proponent. This facility will benefit people from the municipality since it would generate income for the locals and in return would help the community grow.
650 _aWeighing instruments
_zPhilippines
_xInstallation.
_915645
650 _aTruck scales
_z Philippines
_x Design and construction.
_915646
650 _aHarbors
_z Philippines
_z Siquijor
_xEquipment and supplies.
_915647
650 _a Cargo handling
_zPhilippines.
_xManagement.
_915648
650 _aFeasibility studies
_xTransportation
_zPhilippines
_915649
658 _aCapston/Thesis Writing 2 :
_bBusiness Administration, Master Of ;
_cMBA214.
942 _2lcc
_cFS
_hLG 221 D35 G73
_iA5 B87 2013 A73
_kGS (MBA-FS)
999 _c5791
_d5791