100 _aDennoyo, Engr. Elvin A.,
_eauthor.
_916339
245 0 0 _aA feasibility study of the development of a 3.6 MW Hydropower Plant in Anulod River, Barangay Atotes, Bindoy, Negros Oriental /
_cby Engr. Elvin A. Dennoyo.
246 _aDevelopment of a 3.6 MW Hydropower Plant in Anulod River
260 _aDumaguete City :
_bFoundation University,
_c2019.
264 _42019.
300 _3feasibility study
_a96 leaves :
_bill. (some color.) ; photographs ;
_c28 cm.
_fleaves
336 _3rdacontent
_atext
_btxt
337 _3rdamedia
_aunmediated
_bn
338 _2rdacarrier
_3MBA-FS
_avolume
_bnc
490 _aMBA-FS
500 _aFeasibility study submitted to Foundation University.
502 _aGraduate feasibility study (Master in Business Administration) -- Foundation University, 2016.
504 _aIncludes bibliographical references and appendixes.
520 _aAbstract This feasibility study evaluates the proposed development of a 3.6 MW hydropower plant located along Anulod River in Barangay Atotes, Bindoy, Negros Oriental. The study was conducted to determine the project’s viability in terms of technical, market, financial, management, and socio-environmental aspects. Growing energy demand, increasing electricity costs, and the need for sustainable power sources in the province served as the primary motivations for the proposed project. The technical study examined the river’s hydrological characteristics, power generation capacity, plant design, and operational requirements. Findings revealed that the river has sufficient water flow and elevation suitable for renewable energy generation throughout most of the year. Appropriate equipment, construction materials, and engineering methods were identified to support efficient plant operations and long-term sustainability. The market study indicated a continuous increase in electricity consumption in Negros Oriental, demonstrating a stable demand for additional renewable energy supply. The project is expected to contribute to energy security while supporting environmental conservation initiatives and reducing dependence on fossil fuels. Financial analysis showed that the proposed hydropower plant is economically feasible based on projected revenues, operating costs, return on investment, and payback period. The study further determined that the project has strong potential for long-term profitability and investment recovery. Management and organizational assessments confirmed the necessity of employing qualified personnel, engineers, and technical staff to ensure efficient plant operation and maintenance. Environmental and social evaluations also revealed that the project may provide employment opportunities and economic benefits to the local community while maintaining compliance with environmental regulations. Based on the findings, the study concluded that the proposed 3.6 MW hydropower plant in Anulod River, Barangay Atotes, Bindoy, Negros Oriental is feasible and capable of contributing sustainable and reliable energy to the region.
650 _aHydroelectric power plants
_916340
_xPlanning.
650 _aHydropower
_916341
_xEconomic aspects.
650 _aElectric power-plants
_916342
_xDesign and construction.
651 _aBindoy (Negros Oriental, Philippines)
_916706
655 _2lcgft
_aFeasibility studies.
_96607
658 _aCapstone/Thesis Writing 2 :
_bBusiness Administration, Master in.
_cMBA214
711 _aFoundation University,
_eissuing body.
_916705
942 _2lcc
_cFS
_hLG 221 D35 G73
_iA5 B87 2019 D46
_kGS (MBA-FS)
_n0
999 _c6149
_d6149