A feasibility study of the development of a 3.6 MW Hydropower Plant in Anulod River, Barangay Atotes, Bindoy, Negros Oriental / (Record no. 6149)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 03962nam a22003737a 4500 |
| 003 - CONTROL NUMBER IDENTIFIER | |
| control field | OSt |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20260526094317.0 |
| 007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION | |
| fixed length control field | a |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 260526b |||||||| |||| 00| 0 eng d |
| 040 ## - CATALOGING SOURCE | |
| Original cataloging agency | Foundation University |
| Language of cataloging | eng |
| Transcribing agency | Foundation University |
| Description conventions | rda |
| 050 ## - LIBRARY OF CONGRESS CALL NUMBER | |
| Classification number | GS (MBA-FS) LG 221 D35 G73 |
| Item number | A5 B87 2019 D46 |
| 100 ## - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Dennoyo, Engr. Elvin A., |
| Relator term | author. |
| 9 (RLIN) | 16339 |
| 245 00 - TITLE STATEMENT | |
| Title | A feasibility study of the development of a 3.6 MW Hydropower Plant in Anulod River, Barangay Atotes, Bindoy, Negros Oriental /<br/> <br/> |
| Statement of responsibility, etc. | by Engr. Elvin A. Dennoyo. |
| 246 ## - VARYING FORM OF TITLE | |
| Title proper/short title | Development of a 3.6 MW Hydropower Plant in Anulod River |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Dumaguete City : |
| Name of publisher, distributor, etc. | Foundation University, |
| Date of publication, distribution, etc. | 2019. |
| 264 ## - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE | |
| Copyright Date | 2019. |
| 300 ## - PHYSICAL DESCRIPTION | |
| Materials specified | feasibility study |
| Extent | 96 leaves : |
| Other physical details | ill. (some color.) ; photographs ; |
| Dimensions | 28 cm. |
| Type of unit | leaves |
| 336 ## - CONTENT TYPE | |
| Materials specified | rdacontent |
| Content type term | text |
| Content type code | txt |
| 337 ## - MEDIA TYPE | |
| Materials specified | rdamedia |
| Media type term | unmediated |
| Media type code | n |
| 338 ## - CARRIER TYPE | |
| Source | rdacarrier |
| Materials specified | MBA-FS |
| Carrier type term | volume |
| Carrier type code | nc |
| 490 ## - SERIES STATEMENT | |
| Series statement | MBA-FS |
| 500 ## - GENERAL NOTE | |
| General note | Feasibility study submitted to Foundation University. |
| 502 ## - DISSERTATION, THESIS NOTE | |
| Dissertation note | Graduate feasibility study (Master in Business Administration) -- Foundation University, 2016. |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE | |
| Bibliography, etc. note | Includes bibliographical references and appendixes. |
| 520 ## - ABSTRACT. | |
| Abstract | Abstract<br/>This feasibility study evaluates the proposed development of a 3.6 MW hydropower plant located along Anulod River in Barangay Atotes, Bindoy, Negros Oriental. The study was conducted to determine the project’s viability in terms of technical, market, financial, management, and socio-environmental aspects. Growing energy demand, increasing electricity costs, and the need for sustainable power sources in the province served as the primary motivations for the proposed project.<br/><br/>The technical study examined the river’s hydrological characteristics, power generation capacity, plant design, and operational requirements. Findings revealed that the river has sufficient water flow and elevation suitable for renewable energy generation throughout most of the year. Appropriate equipment, construction materials, and engineering methods were identified to support efficient plant operations and long-term sustainability.<br/><br/>The market study indicated a continuous increase in electricity consumption in Negros Oriental, demonstrating a stable demand for additional renewable energy supply. The project is expected to contribute to energy security while supporting environmental conservation initiatives and reducing dependence on fossil fuels.<br/><br/>Financial analysis showed that the proposed hydropower plant is economically feasible based on projected revenues, operating costs, return on investment, and payback period. The study further determined that the project has strong potential for long-term profitability and investment recovery.<br/><br/>Management and organizational assessments confirmed the necessity of employing qualified personnel, engineers, and technical staff to ensure efficient plant operation and maintenance. Environmental and social evaluations also revealed that the project may provide employment opportunities and economic benefits to the local community while maintaining compliance with environmental regulations.<br/><br/>Based on the findings, the study concluded that the proposed 3.6 MW hydropower plant in Anulod River, Barangay Atotes, Bindoy, Negros Oriental is feasible and capable of contributing sustainable and reliable energy to the region. |
| 650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Hydroelectric power plants |
| 9 (RLIN) | 16340 |
| General subdivision | Planning. |
| 650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Hydropower |
| 9 (RLIN) | 16341 |
| General subdivision | Economic aspects. |
| 650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Electric power-plants |
| 9 (RLIN) | 16342 |
| General subdivision | Design and construction. |
| 651 ## - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME | |
| Geographic name | Bindoy (Negros Oriental, Philippines) |
| 9 (RLIN) | 16706 |
| 655 ## - INDEX TERM--GENRE/FORM | |
| Source of term | lcgft |
| Genre/form data or focus term | Feasibility studies. |
| 9 (RLIN) | 6607 |
| 658 ## - INDEX TERM--CURRICULUM OBJECTIVE | |
| Main curriculum objective | Capstone/Thesis Writing 2 : |
| Subordinate curriculum objective | Business Administration, Master in. |
| Curriculum code | MBA214 |
| 711 ## - ADDED ENTRY--MEETING NAME | |
| Meeting name or jurisdiction name as entry element | Foundation University, |
| Subordinate unit | issuing body. |
| 9 (RLIN) | 16705 |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Source of classification or shelving scheme | Library of Congress Classification |
| Koha item type | Feasibility Study |
| Classification part | LG 221 D35 G73 |
| Item part | A5 B87 2019 D46 |
| Call number prefix | GS (MBA-FS) |
| Suppress in OPAC | No |
| Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Home library | Current library | Shelving location | Date acquired | Source of acquisition | Total Checkouts | Full call number | Barcode | Date last seen | Price effective from | Koha item type | Accession Number |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Library of Congress Classification | Room Use Only | Non-fiction | Foundation University Library | Foundation University Library | Capstone, BP, FS | 05/26/2026 | Donated | GS (MBA-FS) LG 221 D35 G73 A5 B87 2019 D46 | 62041 | 05/26/2026 | 05/26/2026 | Feasibility Study | MBA-FS-2026041 |
