Establishment of a NORECO I area office (collection center and sub-station) in Vallerhermoso, Negros Oriental / by Jose Juvileo D. Acabal
Material type:
Article2013 Description: x, 115 leaves : volume 28 cm resourceContent type: - text
- unmediated
- volume
- Electric utilities -- Philippines -- Negros Oriental -- Planning
- Electric substations -- Philippines -- Design and construction
- Electric power distribution -- Philippines -- Management
- Feasibility studies -- Public utilities -- Philippines
- Office buildings -- Planning -- Philippines
- Capston/Thesis Writing 2 : Business Administration, Master Of ; MBA214
- GS (MBA-FS) LG 221 D35 G73 A5 B87 2013 A23
| Item type | Current library | Call number | Status | Barcode | |
|---|---|---|---|---|---|
Feasibility Study
|
Foundation University Library Thesis, Dissertation | GS (MBA-FS) LG 221 D35 G73 A5 B87 2013 A23 c.1 (Browse shelf(Opens below)) | Available | 57956 | |
Feasibility Study
|
Foundation University Library Thesis, Dissertation | GS (MBA-FS) LG 221 D35 G73 A5 B87 2013 A23 c.2 (Browse shelf(Opens below)) | Available | 57957 | |
Feasibility Study
|
Foundation University Library Thesis, Dissertation | GS (MBA-FS) LG 221 D35 G73 A5 B87 2013 A23 c.3 (Browse shelf(Opens below)) | Available | 60646 |
Graduate feasibility study (Master of Business Administration) -- Foundation University, 2013.
Includes bibliographical references and appendices.
ABSTRACT
This feasibility study focused on the establishment of a NORECO1 Area Office
(Collection Center and Sub-Station) in Vallehermoso, Negros Oriental to cater to the
needs of member-consumers in Vallehermoso and the adjacent city of Canlaon. This
3" Area ofice of the eiectric cOoperative will be strategically located aiong the Nationai
Highway near the corner of M. Serion street.
Purposely, the research was conducted in the two districts of Vallehermoso and
Canlaon city with the participation of 382 respondents, out of the total membership of
8,610, chosen using the sloven formula, and further develop through the snowbali
sampling method. To validate their responses, 20 employees in the main office
also interviewed aside from discussing the results with the statistical experts on the
matter.
The viability of the proposed undertaking was determined through the following
key parameters: 1. market acceptability; 2 technical possibility; 3. management
plausibility: 4. financial profitability and 5. socio-economic desirability.
The findings revealed that the planned undertaking is feasible from all aspects of
eration. First, it is technically justifiable due to its strategic location, accessibility to
consumers and availability of basic facilities beneficial to the consumers. Second, this
is plausitble from a management perspective considering that onty 6 persons are initially
needed to keep the Area office operations running. Supervision of the newest office
will be performed by the Area Operations Supervisor who is currently handling the
Guihulngan city coverage. Third, the financial impact to the cooperative is very
favorable especially during the 3d year of financial operations when the key indicators
shall have stabilized already. Naturally, this planned venture will provide additional
revenue to NORECO1 necessary to carry on the developmental mandate of missionary
electrification despite the possibility of low or no income in the entire franchise area.
Finally, this expansion will provide employment opportunities to the residents not to
mention the satisfaction of the consumers within the two districts as a result of bringing
the electric cooperative closer to the people.
There are no comments on this title.